South West Water Contract
Westwood Pipelines Ltd are proud to announce they have successfully secured a framework contract to supply the SLA Barrier Pipe system to South West Water for three years, further details to follow shortly.
Junction 16 M62 Liverpool
United Utilities are the first water authority in the UK to install Westwood Pipelines Ltd 450mm diameter SLA Barrier pipe. The product was supplied in SDR11 (16bar) 12m lengths. The first pipe of its kind in the UK.
SLA Barrier Pipe was the product of choice due to its flexibility, Sub Contractors Morgan Est. were able to manipulate the pipe to accommodated a slight bend, this would not be possible using traditional materials.
Installation time scales were very tight, 132m of SLA Barrier Pipe was installed within three days, and the project has been haled as a great success.
Media City – Salford
Media City is a complex of mixed developments strategically located at the heart of Salford Quays, this historic development is the country’s first designated digital and creative community; a vibrant nucleus that will soon not only house the BBC but will accommodate and inspire creative and new media business from all over the world.
Westwood Pipelines Ltd was proud to supply their 225mm diameter. SDR11 (16bar) SLA Barrier Pipe system for transporting drinking water through contaminated ground, the installation was approved and installed by P N Daly of Milnrow. Westwood Pipelines also supplied pipes sizes including 160mm and 63mm.
225mm diameter SLA Barrier Pipe was the first of its kind to be installed in the UK.
Yorkshire Water Contract

Supply of Safety Line Aluminium (SLA) water Barrier Pipes through out the Yorkshire Water Region. Westwood Pipelines are the only UK supplier that can supply this pipe up to 630mm.
This contract is for the supply of pipe sizes 25mm up to 180mm diameter, with Yorkshire Water and Westwood Pipelines working together and investigating the opportunities of installing larger diameter SLA Barrier Pipes up to 630mm on future projects.
For more information on our SLA Barrier Pipe, please call our experienced team now on +44 (0)1427 875 770 alternatively email sales@westpipes.com
IMERYS Blackpool Pit

Approximately 2425m3 of slurry residue is produced weekly by Blackpool Pit China Clay Slurry Production. The residue is transferred to mica dam where it settles and the excess water is reused in the production process. The pipework supplied will be used to transport this residue to a new settlement area to allow future production at Blackpool Pit for the next 10 years.
The pipes supplied were an SDR9 rated pipe from Egeplast which at 225mm diameter is a much thicker pipe than normally used. This is because of the abrasive nature of clay slurry which causes pipes to wear quickly. The bends had to be designed and constructed in a way that would avoid slurry becoming trapped and causing a blockage.
Wembley Stadium

Westwood supplied all of the fabricated bends, tees and manifolds for the cold water supply for the new stadium. They also manufactured some of the large main feeder manifolds for the water tanks, to supply all of the toilet blocks, in polyethylene instead of the original idea of stainless steel. This meant the manifolds were much easier to handle due to the weight reduction in using plastic instead of steel.